To Do List

Boat

  1. Companionway Doors
    1. Remove, clean, sand, varnish, polish stainless
  2. Interior Lights
    1. Clean and repair update with LED lamps
  3. Deck Hardware – Cabin
    1. Clean, repair and rebed
  4. Companionway Pad
    1. Clean
  5. Companionway Hatch
    1. Remove, clean, sand, varnish, polish stainless, replace weatherstrip
  6. Foredeck Hatch
    1. Clean
    2. Install solar vent fan
    3. Remove and rebed with butyl tape
  7. Side Port Lights
    1. Clean and reseal
  8. Rudder
    1. Repair split and blisters
    2. Repair gelcoat nicks
    3. Clean, Buff and Polish
  9. Bow Hardware and Lights
    1. Clean, repair and rebed
  10. Stern Light
    1. Clean, replace mahogany spacer and rebed
  11. Cockpit Seats
    1. Scrub (white vinegar)
    2. Strip and reseal with Minwax Helmsman Spar Urethane
    3. Order bronze screws
  12. Rub Rails
    1. Clean
  13. Bailers
    1. Clean, repair and rebed
  14. Cover/Step
    1. Clean, sand, varnish, polish stainless
  15. Tables and Shelves
    1. Clean, replace mahogany ply and reseal
    2. Replace white laminate tops (remove sink and leaking hand pump)
    3. Make new mahogany plywood door for sink table
    4. Plug thru-hole with stainless carriage bolt
  16. Cushions
    1. Rework design into four compartment lids with individual foam cushions covered in tan Sunbrella to match remaining canvas.
  17. Bow Locker Cover
    1. Replace mahogany ply
    2. Install cleats for anchor rode
  18. Boston Whaler Decals
    1. Replace
  19. Harpoon 6.2 Decals
    1. Replace
  20. Miscellaneous Hardware
    1. Chainplates
      1. Inspect and Seal
    2. Cleats and fittings
      1. Rebed
    3. Mast Base
      1. Repair rotted core
      2. Rebed with butyl tape
  21. Miscellaneous
    1. Replace both warning decals and capacity plate
    2. Re-wire

Additionally…

  1. Hull
    1. Powerwash
    2. Replace top black stripe
    3. Compound
    4. Repair gelcoat nicks
    5. Seal
    6. Install larger gunnel drain tubes
    7. Drill out and epoxy all screw holes
    8. Repair crack between keel and hull
    9. Bottom paint
    10. Repaint red boot stripe
    11. Apply boat name graphic
  2. Cockpit
    1. Repair all seat holes
    2. Repair and re-bed compass
  3. Cabin
    1. Drill all 10 cover screw holes out to 1/2 inch to allow venting hidden bilge
    2. Replace keel bolt cover with lift-out, two-piece solid mahogany cover
  4. Standing Rig
    1. Refurb mast and boom
    2. Clean and Inspect all wire
    3. Make PVC pipe sleeves for all turnbuckles
  5. Running Rig
    1. Replace all lines and halyards
    2. Make floating winch handle Sunbrella wrap
  6. Sails
    1. Repair holes in new main
    2. Remove stain in new main
    3. Repair slugs on old main
    4. Install Lazy Jacks
    5. Rig Gerr Downhaul
  7. Canvas
    1. Repair windows and zippers in dodger
    2. Make Companionway Cover
    3. Make Foredeck Hatch Cover/Screen

Motor

    1. Purchase 4 hp Mariner long shaft with integral gas tank
    2. Tune-up
      1. Run Seafoam through system
      2. Clean gas tank
      3. Clean fuel screen
      4. New impeller
      5. New spark plug
      6. Change gear oil

Trailer

    1. Strip, scrape and wire brush
    2. Remove stickers
    3. Refurb mfgr label
    4. Replace hitch and jack
    5. Remount bow ladder with spacers
    6. Brush/Spray paint gloss white Rustoleum
    7. Replace lights
    8. Replace safety chains
    9. Replace mast support padding with Sunbrella wrap
    10. Buy spare tire
    11. Buy new ratchet straps
    12. Install PVC pipe loading guide
    13. Modify hitch with telescoping tube extension
    14. Mount strap winch
    15. Install red reflective stripe
    16. Move lights to removable light bar
    17. Touch-up white gloss Rustoleum
Scroll Up